Giant Destroyer Smoke Bombs 48 Pack Kills Moles Gophers Skunks Rats Squirrels

Related posts

Feature

48 Giant destroyer smoke bombs kill gophers; moles; woodchucks; rats skunks & ground
Squirrels *** this product is not for sale to: california or north carolina *** this listing is
For12 packs of 4 each for a total of 48 smoke bombs giant destroyers smoke bombs are
Placed into the burrows of gophers; moles; woodchucks; rats; skunks; and ground squirrels.
These cartridges release a sulfurous smoke in the runways of moles. It is also labeled gophe

Description

48 Giant Destroyer Smoke Bombs Kill Gophers; Moles; Woodchucks; Rats Skunks & Ground Squirrels
*** This Product Is Not For Sale To: CALIFORNIA or North Carolina ***
This listing is for12 packs of 4 each for a total of 48 smoke bombs

Giant Destroyers Smoke Bombs are placed into the burrows of Gophers; Moles; Woodchucks; Rats; Skunks; and Ground Squirrels. These cartridges release a sulfurous smoke in the runways of moles. It is also labeled gophers ;moles; woodchucks; rats; squirrels; ground squirrels and skunks. Light the fuse on the cartridge ; then place the Giant Destroyers in the entrance; quickly covering the cartridge and hole with soil. Read the product details for complete instructions.


Active Ingredients:
Sodium Nitrate.....46.2%
Sulfur.............34.8%
Charcoal............ 8.7%
Other Ingredients...10.3%
Total..............100%

For Use only inside of burrows; never inside of buildings


HOW TO USE THE GIANT DESTROYER Smoke Bomb:

1. Find main runway and clear one opening for easy cartridge insertion. Make sure all other openings are sealed.
2. Insert fuse firmly into cartridge and making sure to leave two inches of fuse exposed.
3. Light fuse and insert cartridge into runway opening. Minimum fuse burning time: 5 seconds.
4. When cartridge begins to smoke; cover opening completely with dirt.
5. USE ONLY INSIDE BURROW; NEVER INSIDE OF BUILDING

MOLES
Locate the main runway; look for fresh conical mounds of dirt. Select the freshest of these; remove plug and dig in direction of main runway. If lateral to the mound is plugged; either dig past the plug or probe ground around the plug to locate main runway. Main runway will be found when probe meets little or no resistance. When runway is found; prepare an opening into runway large enough so that cartridge can be inserted easily. Collect sufficient dirt and other mate